Ideas

Generic Document Report - WIP Material Transactions

Reference Ticket:

https://care.ginesys.in/support/tickets/306665


Module:

  • Ginesys HO --> Production --> Operations --> WIP Material Transactions (After Selecting a Document) --> Action --> Print


Problem Statement:

A single barcode is coming in the multiple line through Generic Document Report which must to be comes in summarily.


The current Document Print of WIP Material Transactions is making mistakes and making our work hassle.


Requirement:

When a single barcode is attached or linked with a single LOT or Working Plan then the barcode should comes summarily in the Document print of WIP Material Transactions.



Thank you

Saurabh Gupta @ +91-8777467172

Agwani Fashions Private Limited

  • Saurabh Gupta
  • Dec 30 2023
  • Attach files
Note : Do not post a lengthy title for an Idea. Post your Idea clearly supported by Screenshots, Examples and Case Studies (if possible).