Dear Sir,
Option of defining CREDIT LIMIT check at either DC or SO or SI level depending upon the business need – as in general check at DC is fine but there are exceptional cases wherein you need to stop either creation of Order itself or Sale invoice specially in case of Export as post DC there are label changing etc happens before sending the goods so control at SI end is required.
Thanks
Ashwani Kumar